EN 50126-3 PDF

Supersedes CLC/TR English version. Railway applications –. The specification and demonstration of. Reliability, Availability. BS PD CLC/TR Railway applications – The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) – Part 3. Buy CLC/TR Railway Applications – The Specification And Demonstration Of Reliability, Availability, Maintainability And Safety (rams) – Part 3.

Author: Aragis Nikosho
Country: Vietnam
Language: English (Spanish)
Genre: Health and Food
Published (Last): 14 August 2011
Pages: 99
PDF File Size: 11.21 Mb
ePub File Size: 8.96 Mb
ISBN: 261-1-74410-870-5
Downloads: 54383
Price: Free* [*Free Regsitration Required]
Uploader: Mijin

This documentation is useful to enable the Customer to compare the different offers on the same basis.

20060515-BS-50126-3-2006.pdf

Terms and Conditions Terms of subscription Online watch. Compliance with a Published Document does not of itself confer immunity from legal obligations. At least, the following general conditions of failure are to be considered as “nonchargeable” when verified: Then, the formula is: Modularity 501263- make it possible to divide maintenance activities into two levels: There are two categories of structures to support RAM analyses: NOTE If it is not possible to measure time to reach maintenance site or to plan maintenance actions, contractual fixed times can be used.

Software for railway control and protection systems. Your basket is empty. Hazards are intentionally repeated in the list, under different categories, to highlight and draw attention to them.

Also, preliminary information on probable cause, including technical evaluation, could be included to enable allocation of acceptance criteria. The aim of this section is to provide simple guide line to help Customers choose appropriate figures for RAM requirements. In this case two choices may be considered for addressing the target of minimising standstill time: Highlight the top most problem contributors affecting contractual service performances,! The following example shows the integration process and the programme implementation when: If technical modifications are necessary, the Supplier should precisely quantify the consequences of modified configuration e.

  IMECHE ENGINEERS DATABOOK PDF

A guide to the application of EN -1 for safety of railway systems Following this simple outline, the derivation of detailed sub-categories and costs can be easily carried out and so it makes modelling of LCC possible. We need your help! Prediction is very difficult, All references to EN concern the version of Communication, signalling and processing systems.

PD CLC/TR 50126-3:2008

Specific requirements for composite insulators used for overhead contact line systems. ISBN – 3 eBook.

Evaluation of removability of an item should also take into account the possible need for removing parts of the rolling stock structure e. Build a watch list Add to the watch list.

Identifying, as part of the RAM analysis process preliminary and detailed analysiscritical scenarios i. It should record and report the processing and implementation status of the modifications and the verification of their compliance with stated RAM Requirements. Regarding FMECA to 501263 functions, it is sufficient to consider the main functions by changing the header deleting the structure reference and by changing some columns deleting the first four columns and inserting suitable columns for numbering functions, description enn the main function, description of sub-function and description of phases of sub-function in the example of the items FMECA sheet in Figure 5.

BSpdf – Free Download PDF

Wollny, 11th July Using the above definition the Customer should specify the Reliability Targets for each one of the Failure Categories in terms of: The replacement should wn compatible in form, fit and function Testability 5.

  BEHRINGER B212A MANUAL PDF

The Main Supplier is responsible for providing visibility of the configuration management process through documented activities and periodic reviews.

However, it provides, only as an example, typical data and document templates for recording the output of a RAM analysis. Also, collection of data from field enables the Main Supplier to: These characteristics define the conditions under which the rolling stock is required to accomplish its mission and constitute the reference conditions for: The frequency time or Km under analysis has to be indicated in the header.

Take the smart route to manage medical device compliance. Any failure occurring on the Rolling Stock and leading, at least, to one of the following conditions: The main purpose of the guide is to: Following up application of these actions during the latest design phases! Identify the problems occurring during the earliest operation phase,!

For parts already in use by the customer, he should supply a list. Generally, the steady state level is achieved at least after two years of revenue 550126-3. The above actions would enable the Customer to make better choices with substantial supporting documentation. In this case two choices can be considered for addressing the target of minimising standstill time: This example may be different to the organisation of the parties 501226-3.

The application of EN -1, EN .